BUILDING MATERIALS, SANITARY & ELECTRICAL • INDUSTRY SOLUTION

Buy by the ton, sell by the bag, deliver to your clients' sites in batches, without a single count variance.

TASTO for building materials, steel, sanitary and electrical traders and distributors: automatic unit conversion, signed partial deliveries to your clients' sites, quotes with validity on the daily steel price, and a per-project account for each contractor or trader with checks and a credit limit.

Try it: deliver batch by batch and watch the building rise; when the contractor nears the limit, deliveries stop until he pays.

8-storey building, Fifth Settlement • SO-B-2210
Eng. Ashraf Abdel-Hamid Contracting
Order value 1,638,000 EGP
Order lines & balance to deliver
  • Rebar 16mm24 t = 1,265 12m bars0 tleft 24 t
  • Portland cement60 t = 1,200 50kg bags0 tleft 60 t
  • Floor tiles 60×60900 m² = 625 1.44m² cartons0 m²left 900 m²
  • Electric wire 3mm4,000 m = 40 100m rolls0 mleft 4,000 m
  • PVC pipe 4"300 3m pipes = 900 linear m0 3m pipesleft 300 3m pipes
Site progress
0/8
floors
Next: Foundations & 1st slab
Contractor's project account
Delivered value0 EGP
Paid (advance + checks)300,000 EGP
Contractor credit (from advance)300,000 EGP
Project credit limit 600,000 EGP
UNITS OF MEASURE ENGINE

The client asks in metres, the yard ships in cartons

Enter what the client asked for in their unit; TASTO rounds to the nearest full carton, roll, or bucket, shows the surplus, and deducts stock in the exact base unit, so counts never show conversion variances.

Move the quantity and watch it round to full packs
Will ship
70
carton
Actually covers
100.8
+0.8 surplus
Line total
38,304
EGP

carton price: 547.2 EGP • stock deduction: exactly 70 carton, not 100 m² rounded by hand.

QUOTE VALIDITY & DAILY PRICES

Steel moved since last week? The old quote won't execute

Every quote has a validity window. If the contractor comes back after it expires, TASTO reprices on today's list automatically; the old price only returns with manager approval.

Quote QT-0418 • Eng. Ashraf Abdel-Hamid
24 t rebar + 60 t cement • valid 2 days
Quote expired
Daily rebar price per ton: tap the day the client came back
Original quote
1,110,000 EGP
At today's prices
1,129,800 EGP
+19,800
Will be invoiced
1,129,800 EGP
repriced on today's list
Your margin was protected from 19,800 EGP in price moves
Complete bathroom kit • for the project
Bathrooms16
  • 42 in stock1,850
  • 30 in stock3,400
  • 0 in stock1,250
  • 18 in stock2,100
  • 55 in stock640
Short for 16 kits: Basin mixer
Kit price
9,240
After 7% kit discount
8,593
Total for 16 kits
137,491 EGP
SANITARY & ELECTRICAL KITS

Sell a complete bathroom kit, and the system checks every piece is in stock

A kit is built from stocked pieces: basin, toilet, mixer, shower, accessories. TASTO prices the kit and its discount, spots the missing piece before you promise your client, and suggests an in-stock alternative.

Illustrative operating scenario

A building materials and steel trader

Monthly count variances appear in tiles and wire because of metre-to-carton conversions, and some contractors draw more than their limit. In TASTO units convert automatically on every movement, delivery notes are signed on site, and deliveries stop when a client exceeds the credit limit.

Typical scale: 3 yards and 2 showrooms • 220 contractors and traders
A composite example of how the work runs on TASTO, not a customer testimonial.

GET STARTED

Count every bag and every metre right, from plant to client site.

Book a 30-minute session with the TASTO team and walk one of your project orders with partial deliveries and checks.