Building Materials Distribution: Units and Site Delivery

The challenges of distributing building, sanitary and electrical materials: buying by the ton and selling by the bag, delivering to job sites, and contractors on credit.

Building Materials Distribution: Units and Site Delivery

Key takeaways

  • Building materials are bought in one unit and sold in another: ton, pallet and roll in, bag, meter and piece out.
  • One wrong conversion factor corrupts stock and cost together.
  • Delivery to a job site needs proof of receipt with name, time and location.
  • Contractors need special prices and credit accounts tied to each project.
In this article
  1. Unit conversion: the foundation
  2. Delivering to the job site
  3. Contractor accounts
  4. Showroom, warehouse and site
  5. FAQ

Distributing building, sanitary and electrical materials has its own logic. Cement is bought by the ton and sold by the bag, cable by the roll and sold by the meter, tiles by the square meter and the carton. The client is often a contractor who wants delivery to a job site, not a shop. These details decide whether a system reflects reality or creates daily discrepancies.

Unit conversion: the foundation

ItemPurchase unitSales unitConversion (example)
CementTon50 kg bag1 ton = 20 bags
Power cableRollMeter1 roll = 100 m
TilesPalletSquare meterBy cartons per pallet and carton area
PipesBundlePipeBy pipes per bundle
Illustrative examples; real factors vary by supplier and product

If a conversion factor is wrong, stock looks larger or smaller than reality, unit cost is miscalculated and prices follow. The factor belongs on the item card, and the system should compute quantities and cost in both directions automatically.

Delivering to the job site

  1. 1

    Site address on the order

    Each order is tied to the project site, not just the contractor's head office.

  2. 2

    The right vehicle

    Load and weight determine the vehicle, and some materials need a crane truck.

  3. 3

    Proof of receipt

    The receiver's name on site, the time, the location and a photo when needed.

  4. 4

    Shortages and returns

    Any shortage or breakage is recorded at delivery with a credit note, instead of a later dispute.

Contractor accounts

  • Special prices per contractor or group, and per project when needed.
  • A credit limit tied to volume and payment history, with post-dated checks tracked as in post-dated check control.
  • A statement per project showing what was delivered to each site and what was paid.
  • Quotations that turn into orders without retyping.

Showroom, warehouse and site

Without one system

  • The showroom sells an item the warehouse ran out of
  • Delivery slips for lack of the right vehicle
  • The contractor disputes quantities with no proof

With one system

  • The showroom sees every warehouse's stock live
  • Delivery planned by load and vehicle
  • Every delivery proven by name, time and location

Vehicle tracking and site arrival follow the same logic as geofenced proof of visit, except the location is a temporary project rather than a permanent client.

TASTO for building, sanitary and electrical distributionPrecise unit conversion, site delivery with proof of receipt, and contractor accounts per project.

Frequently asked questions

How does the system handle buying by the ton and selling by the bag?

With a conversion factor on the item card, so quantities and cost are computed both ways automatically and stock is tracked in the smallest sales unit.

How do I prove delivery to a job site?

Record the receiver's name, time and location at delivery, with any shortage or breakage logged immediately on a credit note.

Can I follow a contractor's account per project?

Yes, by linking orders, deliveries and collections to the project, giving a statement per site.